After the operation of the concrete mixing plant, the operator after a day’s work is required to remove the residues on the mixing tank wall inside and outside the accumulated ash, discharge port, mixing shaft and discharge door, you can use water to rinse these rooms of the equipment, if necessary is to put in a small amount of stone and water mixing after ten minutes to put out. Use water to clean the car, additional agent tank and its supply system. These are all needed to be done after running the play every day.



concrete batching silo in winter need to prevent its rust, winter rain and snow more, is very easy to cause the combination of steel easy in moisture, so that also caused the rust, produce corrosion of the situation description. If it is outdoors in the rain and snow, we should pay attention to the use of plastic film to cover it, and regularly check the batching silo, if the appearance of paint or corrosion to repair in a timely manner.

If the concrete mixing plant is not used in winter, each instrument must be turned on twice a week, and each time it takes half an hour to turn on. This prevents the concrete mixing plant from being left unused for a long time in winter and causing frostbite, or from being unable to start the machine.

Concrete mixing plant in the winter according to the need for production, production in winter is different from other seasons, winter production is the need to pay attention to more matters.